Fire Safety Self-Certification 2025 — Preparing for Post-Inspection under Fire Safety Law 55/2024

Self-certification under Decree 105/2025 — practical guidance for project owners

From 1 July 2025, Fire Safety Law 55/2024 came into full effect, shifting the compliance model from pre-approval to post-inspection. Project owners, contractors and facility operators now bear direct legal responsibility for fire safety compliance — no prior submission or approval is required before construction or operation begins. The fire authority will inspect after the fact. This article sets out how to prepare a self-certification fire safety dossier that meets the new requirements.

Fire Safety Law 55/2024Decree 105/2025Post-inspectionSelf-certificationFire Acceptance 2025NQ 66/2025

1. The fundamental shift — from pre-approval to post-inspection

Before 1 July 2025, the vast majority of projects were required to go through a "fire safety design review" and a formal "fire safety acceptance" conducted by the Police Fire Service. From 1 July 2025:

AspectBefore 1 July 2025From 1 July 2025
ModelPre-approval — submit dossier, wait for approvalPost-inspection — self-certify, authority inspects afterwards
ResponsibilityFire authority confirms each stepProject owner / contractor bears direct legal responsibility
Terminology"Fire safety design review"Term no longer used — replaced by "technical assessment" only when required
Dossier submissionMandatory before construction / commissioningNot required to be submitted in advance — but must be available for inspection at all times
⚠️ Important

Post-inspection does not mean "nothing needs to be done." The project owner must still ensure full compliance — and if an incident occurs or the fire authority requests an inspection, an incomplete or inadequate dossier will result in more serious penalties than under the previous model.

2. What must the self-certification fire safety dossier contain?

Under Decree 105/2025, the self-certification dossier must include:

2.1 Fire safety design documentation

2.2 Construction and internal acceptance documentation

2.3 Operations and emergency response documentation

3. When the authority requests a review

Under Law 55/2024, the fire authority may require the facility operator or project owner to defend the fire safety design dossier at any time, particularly:

The dossier should be maintained in a complete and well-organised form — ready to be presented to the competent authority on request.

4. The role of a fire safety consultant under the post-inspection model

In the view of many practitioners, the role of an independent fire safety consultant remains essential under post-inspection for the following reasons:

Frequently Asked Questions

Does the post-inspection model apply to existing buildings?

Fire Safety Law 55/2024 and Decree 105/2025 apply to both new projects and existing facilities. Existing buildings that have already obtained fire safety acceptance under the previous model are not required to resubmit — however, any renovation, change of use, or system replacement triggers the obligation to prepare an updated self-certification dossier.

How long must the dossier be retained?

The dossier must be retained for the operational life of the building. Fire safety documentation — including original design drawings, commissioning records, and maintenance logs — must be available for presentation to the fire authority on demand at any time during the facility's operational life.

Need help preparing a self-certification fire safety dossier?

VIETSAFE E&C provides end-to-end dossier preparation — design, calculations, commissioning support, and bilingual documentation.

Contact us →